See how London’s roads have changed to accommodate the East-West Cycle Superhighway, a 10km segregated cycle route that runs from Tower Hill to Lancaster Gate.

This video shows side-by-side footage of the roads as they were before construction started (2015) and how they look now that the works are complete (2018).

The pre-construction footage was previously compiled in my earlier video on the subject:

2 COMMENTS

  1. Great footage. Still plenty of work to be done on making a safer street infrastructure for pedestrians and cyclists, but this is progress at last – thanks to groups like SKC and activists attending planning meetings. This is a result of their combined efforts. Thanks for posting EnjoyTheView.